Proposed Infrastructure

The construction of the hospital is divided into three phases with first 100 beds to be inaugurated in December 2017. The scope of the hospital includes healthcare, research labs, a university for undergraduate, graduate and post graduate studies, residential facilities for patients, nurses and doctors, energy center, nursery, retail and a mosque. PKLI will eventually be a facility with 800 beds (extendable to 1500 beds), a100 bed emergency centre, a 100 bed ICU, a 100 beds outpatient dialysis facility, 500-bed in-patient facility, 20 operating rooms & 10 same day surgery suites.